The
Shahid Abbasspour Reservoir Dam and Power Plant House
The Shahid Abbasspour dam is Located 55
km northeast of the city of Masjid-I Soleiman and Approximately 490 km
from the Karun river estuary. Dam construction was initiated in December
1969 and in late November 1976 the reservoir was impounded . By mid 1977
all power generating Units were in full operation.
The Shahid Abbasspour dam is a Concrete
Arch dam which was designed as a multipurpose dam for the provision of
downstream water demands such as those of urban use, irrigation
,industries and flood control.
Activities Carried out by KHEPPMC
1.
Major Overhauling of units no.2 , 3 , and
4 each with a capacity of 250 MW.
2.
Repairing the winding for the main
generator of units no.1 and 3
3.
Major Overhauling of the Spillway gates
mechanical components
4.
Repairing the stop locks of tunnels no.5
and no.6
5.
Preparing of the auxiliary power
transformer for operations
6.
Preparing the interface for the I & C
System and Remote Sensing system
7.
The Grinding of over 30 wicket gate pins
8.
The Overall maintenance and repairs of
the 1st and 2nd powerhouse
Dam Specifications
Type of
Dam: Concrete Arch Dam
Height from Foundation:
200 m
Length of
Crest: 380 m
Width of Crest:
6 m
Features of the Shahid Abbasspour
Reservoir
Total Volume of The
Reservoir 3139 mcm
Flood Routing
Capacity 570 mcm
Total Area of the Reservoir
54.8 km2 at elevation 532.5 m
Length of Reservoir at maximum
elevation 75 km
Number of Spillways
3
Type of
Spillway
Gated Ski-chute
Maximum spilling capacity of
spillway 16,200 m3/s
Features of the Powerhouse
Total Installed Capacity : 2000 MW-1000
MW in the first Powerhouse and 1000 MW in the Second Power house .
Number of Generating Units : 8 units with
a capacity of 250 MW each . In each PowerStation 4 Generating Units are
installed.
Average annual produced energy : 3.316
GW/h (generated at the first PowerStation) Type of Turbine: Francis.
|